Menu bar

13/01/2016

CE6713 ESTIMATION AND QUANTITY SURVEYING-Anna University(Free Download Notes)

CE6713                      ESTIMATION AND QUANTITY SURVEYING             L T P C 0 1 3 2

O BJEC TI V E S:
To provide the student with the ability to estimate the quantities of item of works involved in buildings, water supply and sanitary works, road works and irrigation works, and also to equip the student with the ability to do rate analysis, valuation of properties and preparation of reports for estimation of various items.

UNIT I             ESTIMATE OF BUILDINGS                                                                                   11
Load  bearing  and  framed  structures  –  Calculation  of  quantities  of  brick  work,  RCC,  PCC, Plastering, white washing, colour washing and painting / varnishing for shops, rooms, residential building with flat and pitched roof – Various types of arches – Calculation of brick work and RCC works in arches – Estimate of joineries for panelled and glazed doors, windows, ventilators, handrails etc.

UNIT II            ESTIMATE OF OTHER STRUCTURES                                                                  10
Estimating of septic tank, soak pit – sanitary and water supply installations – water supply pipe line
– sewer line – tube well – open well – estimate of bituminous and cement concrete roads –
estimate of retaining walls – culverts – estimating of irrigation works – aqueduct, syphon, fall.

UNIT III           SPECIFICATION AND TENDERS                                                                             8
Data – Schedule of rates – Analysis of rates – Specifications – sources – Preparation of detailed and general specifications – Tenders – TTT Act – e-tender – Preparation of Tender Notice and Document – Contracts – Types of contracts – Drafting of contract documents – Arbitration and legal requirements.

UNIT IV          VALUATION                                                                                                              8
Necessity – Basics of value engineering – Capitalised value – Depreciation – Escalation – Value of building – Calculation of Standard rent – Mortgage – Lease

UNIT V           REPORT PREPARATION                                                                                         8
Principles for report preparation – report on estimate of residential building – Culvert – Roads –
Water supply and sanitary installations – Tube wells – Open wells.
TOTAL (T:15+P:45): 60 PERIODS
OUTCOMES:
The student shall be able to estimate the material quantities, prepare a bill of quantities, make specifications and prepare tender documents.  Student shall be able to prepare value estimates.

TEXTBOOKS:
1.  Dutta, B.N., “Estimating and Costing in Civil Engineering”, UBS Publishers & Distributors
Pvt. Ltd., 2003
2.  Kohli, D.D and Kohli, R.C., “A Text Book of Estimating and Costing (Civil)”, S.Chand &
Company Ltd., 2004

REFERENCES:
1.  PWD Data Book.
2.  Tamilnadu Transparencies in Tender Act, 1998
3.  Arbitration and Conciliation Act, 1996
4.  Standard Bid Evaluation Form, Procurement of Goods or Works, The World Bank, April
1996.